Goto Section: 32.2431 | 32.2680 | Table of Contents

FCC 32.2441
Revised as of
Goto Year:1996 | 1998
Sec. 32.2441  Conduit systems.

    (a) This account shall include the original cost of conduit, whether 
underground, in tunnels or on bridges, which is reusable in place. It 
shall also include the cost of opening trenches and of any repaving 
necessary in the construction of conduit plant.

[[Page 441]]

    (b) The cost of pumping water out of manholes and of cleaning 
manholes and ducts in connection with construction work and the cost of 
permits and privileges for the construction of cable and wire facilities 
shall be included in the account chargeable with such construction.
    (c) The cost of protective covering for buried cable shall be 
charged to Account 2423, Buried Cable, as appropriate, unless such 
protective covering is reusable in place. The amounts thus charged shall 
be included in the nonmetallic buried cable or metallic buried cable 
subsidiary record category, as appropriate.
    (d) The cost of pipes or other protective covering for underground 
drop and block wires shall be included in Account 2421, Aerial Cable, or 
Account 2423, Buried Cable, as appropriate. The amounts thus charged 
shall be included in the nonmetallic or metallic subsidiary record 
category, as appropriate.


Goto Section: 32.2431 | 32.2680

Goto Year: 1996 | 1998
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public