Sec. 78.36 Frequency coordination.
(a) 12.7-13.25 GHz. Coordination of fixed and mobile assignments
will be in accordance with the procedures set forth below.
(1) Before filing an application for new or modified facilities
under this part the applicant must perform a frequency engineering
analysis to ensure that the proposed facilities will not cause
interference to existing or previously applied for stations in this band
of a magnitude greater than that specified below.
(2) The general criteria for determining allowable adjacent or co-
channel interference protection to be afforded, regardless of system
length or type of modulation, multiplexing or frequency band shall be
such that the interfering signal shall not produce more than 1.0 dB
degradation of the practical threshold of the protected receiver. The
degradation is determined by calculating the ratio in dB between the
desired carrier signal and undesired interfering signal (C/I ratio)
appearing at the input to the receiver under investigation (the victim
receiver). The development of the C/I ratios from the criteria for
maximum allowable interference level per exposure and the methods used
to perform path calculations shall follow generally acceptable good
engineering practices. Procedures as may be developed by the Electronics
Industries Association (EIA), the Institute of Electrical and
Electronics Engineers, Inc. (IEEE), the American National Standards
Institute (ANSI) or any other recognized authority will be acceptable to
the Commission.
(3) Where the development of the carrier to interference ratio (C/I)
is not covered by generally acceptable procedures or where the applicant
does not wish to develop the carrier to interference ratio, the
applicant shall employ the following C/I protection ratios:
[[Page 679]]
(i) Co-channel interference: For both sideband and carrier-beat,
(applicable to all bands) the previously authorized system shall be
afforded a carrier to interfering signal protection ratio of at least 90
dB.
(ii) Adjacent channel interference: The existing or previously
authorized system shall be afforded a carrier to interfering signal
protection ratio of at least 56 dB.
(b) 6425-6525 MHz and 17.7-19.7 GHz. Coordination of fixed and
mobile assignments will be in accordances with the procedure established
in Sec. 21.100(d), except that the prior coordination process for mobile
(temporary fixed) assignments may be completed orally and the period
allowed for response to a coordination notification may be less than 30
days if the parties agree.
[ 48 FR 50736 , Nov. 3, 1983, as amended at 52 FR 7144 , Mar. 9, 1987]
Subpart C--General Operating Requirements
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.