Goto Section: 90.631 | 90.635 | Table of Contents
FCC 90.633
Revised as of
Goto Year:1996 |
1998
Sec. 90.633 Conventional systems loading requirements.
(a) Non-SMR conventional systems of communication will be authorized
on the basis of a minimum loading criteria of seventy (70) mobile
stations for each channel authorized.
(b) A channel will not be assigned to additional licensees when it
is loaded to 70 mobile stations. Where a licensee does not load a
channel to 70 mobiles the channel will be available for assignment to
other licensees. All authorizations for conventional systems are issued
subject to this potential channel sharing condition.
(c) Except as provided in Sec. 90.629 licensees of conventional
systems must place their authorized facilities in operation not later
than eight months after the date of grant of the license for the system.
(d) If a station is not placed in operation in eight months, except
as provided in Sec. 90.629, its license cancels automatically and must
be returned to the Commission. For purposes of this section, a base
station is not considered to be placed in operation unless at least one
associated mobile station is also placed in operation.
(e) A non-SMR licensee may apply for additional frequency pairs if
its authorized conventional channel(s) is loaded to seventy (70)
mobiles. Applications may be considered for additional channels in areas
where spectrum is still available and not applied for, even if the
already authorized channel(s) is not loaded to 70 mobile units, upon an
appropriate demonstration of need.
(f) Wide area systems may be authorized to persons eligible for
licensing
[[Page 563]]
under subparts B or C of this part upon an appropriate showing of need.
For loading purposes, if the total number of mobile stations justifies
the total number of authorized based frequencies in a given area, the
system will be construed to be loaded.
(g) Regional, statewide, or ribbon configuration systems may be
authorized to persons eligible for licensing under subparts B or C of
this part upon an appropriate showing of need. In a ribbon, regional or
statewide system, a mobile station will be counted for channel loading
purposes only for the base station facility in the geographic area in
which it primarily operates. If this cannot be determined, it will be
counted fractionally over the number of base station facilities with
which it communicates regularly.
[ 47 FR 41032 , Sept. 16, 1982, as amended at 48 FR 51929 , Nov. 15, 1983;
56 FR 65860 , Dec. 19, 1991; 59 FR 59966 , Nov. 21, 1994; 62 FR 18935 ,
Apr. 17, 1997]
Effective Date Note: At 62 FR 18935 , Apr. 17, 1997, Sec. 90.633 was
amended by revising the first sentences of paragraphs (f) and (g),
effective Oct. 17, 1997.
Technical Regulations Regarding the Use of Frequencies in the 806-824
MHz, 851-869 MHz, 896-901 MHz, and 935-940 MHz Bands
Goto Section: 90.631 | 90.635
Goto Year: 1996 |
1998
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public