FCC 22.951 Revised as of October 1, 2005
Goto Year:2004 |
2006
Sec. 22.951 Minimum coverage requirement.
Applications for authority to operate a new cellular system in an unserved
area, other than those filed by the licensee of an existing system that
abuts the unserved area, must propose a contiguous cellular geographical
service area (CGSA) of at least 130 square kilometers (50 square miles).
Area within contract SAB extensions counts toward the minimum coverage
requirement. However, area within de minimis SAB extensions does not count
toward the minimum coverage requirement. Applications for authority to
operate a new cellular system in an unserved area, other than those filed by
the licensee of an existing system that abuts the unserved area, must not
propose coverage of water areas only (or water areas and uninhabited islands
or reefs only), except for unserved areas in the Gulf of Mexico MSA.
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.