Goto Section: 15.305 | 15.309 | Table of Contents
FCC 15.307
Revised as of October 1, 2010
Goto Year:2009 |
2011
§ 15.307 Coordination with fixed microwave service.
(a) UTAM, Inc. is designated to coordinate and manage the transition of
the 1910-1930 MHz band from the Private Operational-Fixed Microwave
Service (OFS) operating under part 101 of this chapter to unlicensed
PCS operations,
(b) Each application for certification of equipment operating under the
provisions of this subpart must be accompanied by an affidavit from
UTAM, Inc. certifying that the applicant is a participating member of
UTAM, Inc. In the event a grantee fails to fulfill the obligations
attendant to participation in UTAM, Inc., the Commission may invoke
administrative sanctions as necessary to preclude continued marketing
and installation of devices covered by the grant of certification,
including but not limited to revoking certification.
(c) An application for certification of a PCS device that is deemed by
UTAM, Inc. to be noncoordinatable will not be accepted until the
Commission announces that a need for coordination no longer exists.
(d) A coordinatable PCS device is required to incorporate means that
ensure that it cannot be activated until its location has been
coordinated by UTAM, Inc. The application for certification shall
contain an explanation of all measures taken to prevent unauthorized
operation. This explanation shall include all procedural safeguards,
such as the mandatory use of licensed technicians to install the
equipment, and a complete description of all technical features
controlling activation of the device.
(e) A coordinatable PCS device shall incorporate an automatic mechanism
for disabling operation in the event it is moved outside the geographic
area where its operation has been coordinated by UTAM, Inc. The
application for certification shall contain a full description of the
safeguards against unauthorized relocation and must satisfy the
Commission that the safeguards cannot be easily defeated.
(f) At such time as the Commission deems that the need for coordination
between unlicensed PCS operations and existing Part 101 Private
Operational-Fixed Microwave Services ceases to exist, the disabling
mechanism required by paragraph (e) of this section will no longer be
required.
(g) Operations under the provisions of this subpart are required to
protect systems in the Private Operational-Fixed Microwave Service
operating within the 1850-1990 MHz band until the dates and conditions
specified in § § 101.69 through 101.73 of this chapter for termination
of primary status. Interference protection is not required for part 101
stations in this band licensed on a secondary basis.
(h) The operator of a PCS device that is relocated from the coordinated
area specified by UTAM, Inc., must cease operating the device until
coordination for the new location is verified by UTAM, Inc.
[ 58 FR 59180 , Nov. 8, 1993, as amended at 59 FR 32852 , June 24, 1994;
60 FR 27425 , May 24, 1995; 61 FR 29689 , June 12, 1996]
Goto Section: 15.305 | 15.309
Goto Year: 2009 |
2011
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public