§ 1.1312 Facilities for which no preconstruction authorization is required.
(a) In the case of facilities for which no Commission authorization
prior to construction is required by the Commission's rules and
regulations the licensee or applicant shall initially ascertain whether
the proposed facility may have a significant environmental impact as
defined in § 1.1307 of this part or is categorically excluded from
environmental processing under § 1.1306 of this part.
(b) If a facility covered by paragraph (a) of this section may have a
significant environmental impact, the information required by § 1.1311
of this part shall be submitted by the licensee or applicant and ruled
on by the Commission, and environmental processing (if invoked) shall
be completed, see § 1.1308 of this part, prior to the initiation of
construction of the facility.
(c) If a facility covered by paragraph (a) of this section is
categorically excluded from environmental processing, the licensee or
applicant may proceed with construction and operation of the facility
in accordance with the applicable licensing rules and procedures.
(d) If, following the initiation of construction under this section,
the licensee or applicant discovers that the proposed facility may have
a significant environmental effect, it shall immediately cease
construction which may have that effect, and submit the information
required by § 1.1311 of this part. The Commission shall rule on that
submission and complete further environmental processing (if invoked),
see § 1.1308 of this part, before such construction is resumed.
(e) Paragraphs (a) through (d) of this section shall not apply:
(1) To the construction of mobile stations; or
(2) Where the deployment of facilities meets the following conditions:
(i) The facilities are mounted on structures 50 feet or less in height
including their antennas as defined in § 1.1320(d), or the facilities
are mounted on structures no more than 10 percent taller than other
adjacent structures, or the facilities do not extend existing
structures on which they are located to a height of more than 50 feet
or by more than 10 percent, whichever is greater;
(ii) Each antenna associated with the deployment, excluding the
associated equipment (as defined in the definition of antenna in
§ 1.1320(d)), is no more than three cubic feet in volume;
(iii) All other wireless equipment associated with the structure,
including the wireless equipment associated with the antenna and any
pre-existing associated equipment on the structure, is no more than 28
cubic feet in volume; and
(iv) The facilities do not require antenna structure registration under
part 17 of this chapter; and
(v) The facilities are not located on tribal lands, as defined under 36
CFR 800.16(x); and
(vi) The facilities do not result in human exposure to radiofrequency
radiation in excess of the applicable safety standards specified in
§ 1.1307(b).
[ 55 FR 20396 , May 16, 1990, as amended at 56 FR 13414 , Apr. 2, 1991; 83 FR 19458 , May 3, 2018]
return arrow Back to Top
Goto Section: 1.1311 | 1.1313
Goto Year: 2018 |
2020
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public