Goto Section: 90.629 | 90.633 | Table of Contents
FCC 90.631
Revised as of September 1, 2021
Goto Year:2020 |
2022
§ 90.631 Trunked systems loading, construction and authorization
requirements.
(a) Non-SMR trunked systems will be authorized on the basis of a
loading criteria of one hundred (100) mobile stations per channel. For
purposes of determining compliance with trunked system loading
requirements under this subpart, the term “mobile station” includes
vehicular and portable mobile units and control stations.
(b) Each applicant for a non-SMR trunked system must certify that a
minimum of seventy (70) mobiles for each channel authorized will be
placed into operation within five (5) years of the initial license
grant.
(c) Except for SMR applicants and as provided in paragraph (d) of this
section, an applicant seeking to expand a trunked system by requesting
additional channels from the Commission, or through intercategory
sharing, or through an assignment, must have a loading level of seventy
(70) mobiles per channel on the existing system that is the subject of
the expansion request.
(d) In rural areas, a licensee of a trunked system may request to
increase its system capacity by five more channels than it has
constructed without meeting the loading requirements specified in
paragraphs (b) and (c) of this section. A rural area is defined for
purposes of this section as being beyond a 100-mile radius of the
following designated centers of the following urban areas: New York,
NY; Los Angeles, CA; Chicago, IL; Philadelphia, PA; San Francisco, CA;
Detroit, MI; Boston, MA; Houston, TX; Washington, DC; Dallas-Fort
Worth, TX; Miami, FL; Cleveland, OH; St. Louis, MO; Atlanta, GA;
Pittsburgh, PA; Baltimore, MD; Minneapolis-St. Paul, MN; Seattle, WA;
San Diego, CA; and Tampa-St.Petersburg, FL. The coordinates for the
centers of these areas are those referenced in § 90.741, except that the
coordinates (referenced to North American Datum 1983 (NAD83)) for
Tampa-St. Petersburg are latitude 28°00′1.1″ N, longitude 82°26′59.3″
W.
(e) Except as provided in § 90.629, licensees of trunked facilities must
complete construction within one year.
(f) If a station is not placed in permanent operation, in accordance
with the technical parameters of the station authorization, within one
year, except as provided in § 90.629, its license cancels automatically.
For purposes of this section, a base station is not considered to be
placed in operation unless at least two associated mobile stations, or
one control station and one mobile station, are also placed in
operation.
(g) Wide area systems may be authorized to persons eligible for
licensing under subparts B or C of this part upon an appropriate
showing of need. Remote or satellite stations of wide area systems in
the Public Safety, Special Emergency, Telephone Maintenance, and Power
Radio Services may be authorized on a primary basis if such stations
are the first to be authorized in their area of operation on the
frequency or group of frequencies. Remote or satellite stations of wide
area systems in all other services will be authorized only on a
secondary, non-interference basis to cochannel licensees. To determine
system loading, the total number of mobile units and control stations
operating in the wide-area system shall be counted with respect to the
total number of base station frequencies assigned to the system.
(h) Regional, statewide, or ribbon configuration systems may be
authorized to persons eligible for licensing under subparts B or C of
this part upon an appropriate showing of need. In a ribbon, regional or
statewide system, a mobile station will be counted for channel loading
purposes only for the base station facility in the geographic area in
which it primarily operates. If this cannot be determined, it will be
counted fractionally over the number of base station facilities with
which it communicates regularly.
[ 47 FR 41032 , Sept. 16, 1982]
Editorial Note: For Federal Register citations affecting § 90.631, see
the List of CFR Sections Affected, which appears in the Finding Aids
section of the printed volume and at www.govinfo.gov.
Goto Section: 90.629 | 90.633
Goto Year: 2020 |
2022
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public